Branston L4m Tower
England
Branston L4m Tower
A planned solar farm between Lincoln and Sleaford, the site for which was chosen due to its close proximity to the Lincoln-Sleaford REP-Bourne-West Bourne line, required an additional connection to the 132kV line.
We were engaged to install a new L4m DJT M3 tower with 6 crossarms, work with designers to design and install the pad and chimney foundation, terminate the existing ACSR LYNX and HORSE conductors onto the new tower and install downleads into the new substation.