NorPower were principal contractor on the refurbishment of the 132kV DC PL16 Dunoon-Whistlefield overhead line during the summer of 2014. This line passes over very arduous terrain which, following risk assessment, led to a helicopter being utilised to transport personnel and materials to the most isolated areas.
The refurbishment programme included replacing insulators and earthwire, re-painting towers and muff replacement as required.