The Balblair rationalisation project required a terminal tower with cable sealing end platform to be erected to facilitate the undergrounding of a section of the Shin 132kV overhead line.

The tower is a split basket design with the circuits terminated either side of the tower and one circuit routed within the base of the tower due to limited site boundaries. In addition to erection of the terminal tower and associated downlead and OPGW works, 7 towers and associated conductors were removed from this line. 